I cannot figure out how to get the pie-chart transition to work in Chapter 5. I started with the code from Fig_05_06.html and tried to update it with the code given on pages 146 to 148. I get the final pie image (the right-hand image in Figure 5.7) and a sort-of transition thing going, but it definitely does not start with the pie I'm supposed to be starting with (the left-hand image in Figure 5.7).
Can somebody provide the complete code for this pie-chart transition? Thanks.
|